Recent Projects
Drainage Consulting Services
In the past decade, the Government of Hong Kong SAR have expended significant resources to alleviate and resolve on the problems posed by severe flooding during wet seasons within the territory, especially in the North West New Territories and Central Kowloon Region. Many drainage rehabilitation works contracts have been carried out which required a substantial amount of river training and diversion of existing drainage facilities. C & A had been offering such drainage work consultant services to clients related to these government drainage contracts. Such consultancy services includes drainage impact assessment study on the local community habitat resulting from the proposed drainage construction work and the likely effects of the associated drainage or stream diversion scheme. Some of these drainage consulting services have been provided for the following projects:
- Drainage Connection for Proposed Building
No.157 Argyle Street,Kowloon
- Drainage Connection for Proposed Building
DD22,Ma Wo Road,near Grand Dynasty View,Tai Po,NT
- Contract ST/2008/01
Civil Engineering and Development Department Shat Tin New Town Stage II,Road T3 and Associated Roadworks-Remaining Works,Phase 1
- Contract HL/2008/01
Civil Engineering and Development Department Hui Development-Engineering Works in Area 16,Yuen Long,Phase 2-Extension of Road L3
- Contract DC/2007/11
Drainage Services Department Drainage Maintenance and Construction in Mainland South Districts(2007-2011)
- Proposed Redevelopment at 6-8 Sai Yuen Anderson Hill,Sau Mau Ping,Kwun tong
Tin Hau Temple,Sau Mau Ping
- Contract No. CV⁄2004⁄07
Civil Engineering and Development Department Drainage Rehabilitation Works at Sha Po Tsuen Stream, Yuen Long
- Proposal Residential Development at Lots 379 & 380 RP in DD 168 Tao Fung
Shan, Sha Tin, N.T.
- Contract No. CV⁄98⁄08
Civil Engineering Department Formation and
Servicing of Fanling Area 36, Phase 1 (CEI)
- Excavation of Trial Pit for Proposed Building
Hoi Yuen Road Opposite to Kwun
Tong Plaza,Kowloon
- Contract SS R325
Architectural Services Department Construction of District Open Space in Shek Yam Estate-Phase 1 & 4,Kwai Chung Local Open Space in Area 28,Fanling/Sheung Shui and Local Open Space in Area 50,Sham Tseng,Tsuen Wan
- Contract HY/2007/16
Highways Department Widenging of Castle Peak Road-San Tin near Tsing Lung Tsun,Yuen Long
- Contract TP/2007/02
Civil Engineering and Development Department Formation and Engineering Infrastructure Works for Cheung Shue Tan,Tai Po Mei and Adjacent Areas
- Contract No. FL22⁄98
Territory Development Department Main Drainage Channels for Fanling, Sheung Shui and Hinterland
- Contract No. DC⁄2000⁄08
Drainage Services Department Village Flood Protection Works for Wang Chau, Mai Po Lo Wai and Mai Po San Tsuen
and Drainage Improvement Works at Tan Kwai Tsuen
- Contract No. DC⁄99⁄09
Drainage Services Department Village Flood
Protection Works for Chuk Yuen Tsuen and Ha San Wai
- Contract No. NL 6⁄95
Territory Development Department Tung Chung
Development Phase IIB - Main Works
Back to Recent Projects
|