C&A (HK) Consulting Ltd.

Recent Projects

Independent Checking Engineering Services

C & A also offers consultant services in the capacity of independent checking engineer on temporary work design of contractors and alternative design of permanent work by other consultants. C & A have been providing such services to clients related to construction projects of both building and infrastructure works. Some of these independent checking engineer services have been provided for the following projects:

  • Contract KL/2009/01
    Civil Engineering and Development Department
    Site Formation for Kai Tak Cruise Terminal Developmnet
  • Contract 1044EM08
    Independent Checking Engineer Services on Foundation Design for Installation of Camera Recorder&Flashlight metallic Poles
  • Wan Fau Sin Koon Extension Internal Drainage
    Typical Trench Shoring Design of 4m Depth
  • Contract EX T308
    Extension to Jockey Club Elaine Field School in Area 9,Tai Po Typical Trench Shoring Design of 2.5m Depth
  • Contract No.DC/2007/19
    Drainage Services Department
    Drainage Maintenance and Construction in Mainland South Districts (2007-2011).
  • Contract No.ST/2008/01
    Civil Engineering and Development Department
    Shat Tin New Town Stage II, Road T3 and Associated Roadworks - Remaining Works, Phase 1
  • Contract No.2003-0099
    Kowloon Canton Railway Corporation
    Provision of Tunnel Ventilation System for Beacon Hill Tunnel
    Construction of Pump House and Water Tank
  • Contract DC/2007/21
    Drainage Services Department
    Construction of Sha Tin Sewage Treatment Works Stage Ш Extension Final Phase
  • Contract No.TP/2007/02
    Civil Engineering and Development Department
    Formation and Engineering Infrastructure Works for Cheung Shue Tan, Tai Po Mei and Adjacent Areas
  • Terminal 8- CROSSWHARF
    Kwai Chung Container Port
    Installation for Rails for RMJCs
  • Contract No.DC/2006/02
    Drainage Services Department
    Yuen Long, Kam Tin, Ngau Tam Mei and Tin Shui Wai, Drainage Improvements, Stage 1, Phase 2B –Cheung Chun San Tsuen and Kam Tsin Wai)
  • The Venettian Macau
    The Venettian Macau WP 8041 External Work
  • Contract No.DC/2002/02
    Drainage Services Department
    Wan Chai East and North Point Seweage Remaining Works
  • Contract No.CV/2004/01
    Civil Engineering and Development Department
    Maintenance and Repairs of Seawalls,Piers and Other Port
  • AA Contract M960
    Airport Authority Hong Kong
    Landside Landscape modification Works
  • Contract No.GE/2004/32
    Civil Engineering and Development Department
    10-year Extended Landship Preventive Measures Project,Phase 3,Package L-Landslip Preventive Works for Slopes in Tai Po and Yuen Long
  • Contract No.10/LANDS/03
    LANDS Department
    Slope maintenance and ImprovementWorksOver the Northern Regions of the Territory
  • LWK & Partners(HK)Ltd.
    Alterations&Additions,Proposed A/C Water Cooling Tower at Apartment Commercial Building,San Fung Avenue
  • Contract No. 10⁄LANDS⁄03
    Lands Department
    Slope Maintenance and Improvement Works over the Northern Regions of the Territory
  • Project K-11 Hanoi Road Development Working Platform Design
  • Contract No. CV⁄2001⁄08
    Civil Engineering and Development Department
    Maintenance & Repairs to Government ⁄ Public Piers and Immersed Tube of Hung Hom Cross Harbour Tunnel (2002 - 2005) 
  • Contract No. 8⁄WSD⁄00
    Water Supplies Department
    Mainslaying between Au Tau Treatment Works and Yuen Long Town
  • Contract No. ALL315
    Architectural Services Department
    School Improvement Programme Final Phase Package 3, Group 2
  • Contract No. DC⁄2002⁄03
    Drainage Services Department
    Construction of Trunk Sewers and Sewage Pumping Stations at Yuen Long South, Area 13, Area 14 and Au Tau
  • Contract No. DC⁄98⁄21
    Drainage Services Department
    West Kowloon Drainage Improvement Works Stage 2, Phase 2, Remaining Works Stage 3 Phase 1 Tai Kok Tsui and Sham Shui Po Area
  • Contract No. HK1101
    Refurbishment works at Pier 4-6 and Miscellaneous Remaining Works in Central Reclamation, Phase 1
  • HKHA Contract 48 of 1999
    Site Formation Works for Public Housing Development at Tung Tau Cottage Area
  • HKHA Contract 99 of 1998
    Term Contract for Slope Maintenance and Improvement Works for Region (1999-2001)
  • HKHA Contract 2 of 1998
    Tin Shui Wai Area 110 Phase 3
  • Contract No. DC⁄99⁄08
    Drainage Services Department
    Debris Flow Mitigation Works and Drainage Improvement Works at Sham Tseng San Tsuen
  • Contract No. SSG367
    Architectural Services Department
    Ma On Shan Areas 77, 90B and 100, Construction of Three Nos of Standard Primary School
  • Contract No. NL3⁄93
    Territory Development Department
    North Lantau Development, North Lantau Sewage Treatment Facilities, Sewage Treatment Works and Pumping Station
  • Contract No. NL6⁄95
    Territory Development Department
    Tung Chung Development Phase IIB - Main Works
  • Contract No. CV⁄94⁄07
    Civil Engineering Department
    Reclamation for Shipyard at To Kau Wan - North Lantau
  • Contract No. 13⁄WSD⁄95
    Water Supplies Department
    Western & Central District Water Supply - Stage 1, Mainlaying in Sheung Wan & Sai Ying Pun

 

 

  • Contract KL/2009/01
    Civil Engineering and Development Department
    Site Formation for Kai Tak Cruise Terminal Development
  • Contract SS.S311
    Fabrication & Installation of GRC Clock Tower Feature for the Construction of Sun Yat Sen Memorial Park and Swimming Pool Complex
  • Contract HY/2009/23
    Highways Department
    Hong Kong Boundary Crossing Facilities
  • Proposed Residential Development at Tin Shui Wai Town Lot No.24,Area 33
    Typical Trench Shoring Design of 2.5m Depth
  • Contract No.HY/2007/03
    Highways Department
    Extension of Footbridge Network in Tsuen Wan –
    Footbridge A along Tai Ho Road
  • Contract No.YL/2008/01
    Civil Engineering and Development Department
    Kau Hui Development – Engineering Works in Area 16, Yuen Long, Phase 2 – Extension of Road L3
  • Contract No.HY/2007/16
    Highways Department
    Widening of Castle Peak Road – San Tin near Tsing Lung Tsun, Yuen Long
  • Contract No.DC/2007/11
    Drainage Services Department
    Drainage Maintenance and Construction in Mainland South Districts (2007-2011)
  • AA Contract P374
    Hong Kong Airport Authority
    Aircraft Hangars Enabling Works
  • Contract No.TP/2007/01
    Civil Engineering and Development Department
    Remaining Engineering Infrastructure Works for Pak Shek Kok Development, Package 2B
  • Hong Kong Disneyland Project 414&214
    Hong Kong Disneyland
    It's a Small World;Main Entry Restroom
  • Contract No.ST/2005/02
    Civil Engineering and Development Department
    Sha Tin New Town, Stage II
    Road Works at Areas 34 and 52 in Shui Chuen O and Area 56A in Kau To
  • Contract No.CV/2003/06
    Civil Engineering and Development Department
    Stanley Waterfront Improvement Project-Construction of Pier and Boardwalk
  • Contract HY/2003/28
    Highways Department
    Rehabilitation of Chung Hom Kok Road
  • Contract No.CV/2004/02
    Civil Engineering and Development Department
    Reconstruction of Wong Shek and Ko Lau Wan Public Piers
  • Contract No.GE/2003/01
    Civil Engineering and Development Department
    10-year Extended Landship Preventive Measures Project,Phase 4,Package I-Landslip Preventive Works for Slopes in HongKong island,Kowloon and the New Territories
  • H1 - Main Contract
    Hong Kong Disneyland Resort Project
    Disney Hollywood Hotel
  • KCRC Contract No. LDB-201
    Sheung Shui to Chau Tau Tunnels
  • Urban Renewal Authority
    Contract K2
    Comprehensive Redevelopment Site B
  • Contract No. GE⁄01⁄39
    Civil Engineering and Development Department
    10-year Extended Landslip Preventive Measures Project, Phase II, Package N - Landslip Preventive Works for Slopes
  • Contract No. GE⁄2002⁄05
    Civil Engineering Department
    10-year Extended Landslip Preventive Measures Project, Phase 2, Package D - Landslip Preventive Works for Slope in Kowloon and the Northern New Territories
  • Proposed Residential Development at K.I.L No. 11152, Hoi Fai Road, Kowloon
  • Upgrading Project in Hong Kong Jockey Club 4⁄F & 5⁄F Loge at Happy Valley Racecourse
  • Contract No. CV⁄2000⁄09
    Civil Engineering Department
    Contract Infrastructure for Penny?s Bay Development, Contract I
  • Contract No. DC⁄98⁄17
    Drainage Services Department
    West Kowloon Drainage Improvement Works Stage 2, Phase 1, Tai Kok Tsui and Mong Kok Area
  • Contract No.DC⁄2001⁄04
    Central, Western and Wan Chai West Interceptor and Reticulation Sewers - Lower Catchment (Phase 1 Works)
  • Contract SSH339
    Architectural Services Department
    Standard 30-Classroom Primary School (2000 Design) at Hung Hom Bay, Kowloon
  • Contract No. GE⁄99⁄21
    Civil Engineering Department
    10-year Extended LPM Project, Phase 1, Package D, Landslip Preventive Works for Slopes along Clear Water Bay Road and Beacon Hill Catchwater in the New Territories
  • Contract No. CV⁄97⁄08
    Civil Engineering Department
    Maintenance and Repairs to Franchised & Licensed Ferry Piers and Other Port Works (1998-2000)
  • Contract No. SSE 438
    Architectural Services Department
    Construction of Swimming Pool Complex, Library, IRC & DOS at TKO Area 24
  • Contract No. CV⁄95⁄06
    Civil Engineering Department
    Rural Planning & Improvement Strategy, Formation of San Tsuen Pai Northeast Platform
  • Contract No. UA16⁄92
    Territory Development Department
    West Kowloon Reclamation Sewerage Network Package 1
  • HAD Contract YLRP 1 of 96-97
    Construction of Drainage System at Lau Fau Shan along Deep Bay Road, Ha Tsuen
  • Contract UA11⁄91
    Mass Transit Railway Corporation
    Central Reclamation - Phase 1 - Engineering Works


Back to Recent Projects
C and A logo